Home > News >News

    Assembly of SP sump pump Bearing Assembly

    When assemblythe bearing assemblies must be preheated and the temperature must not be more then 120. Double rowstaperedroller bearings are adopted for the lower bearing and their conepup and position sleeve is assembled in setwhich can not be interchangeable with corresponding parts of the same kind of bearing. When the lower end cover of bearing is assembledit must be noted that the surface of lip seal in recess of lower end cover should be outward and the oil retaineretc. must agree to the position in assembly drawing. When piston ring is assembledit must be noted that the mouth of the piston ring should not be overlapped at the direction of diameter. Because axial clearance has been ensured by bearings themselvesthe clearance of the bearing assembly of the sump pump should not be adjusted in the assembly. But after assemblyit is suggested that the end face clearance in installation should be checked according to the following values in Table 1.

    Table 1

    Bearing assemblies

    End face clearance (mm)

    PV

    0.074-0.160

    QV

    0.114-0.208

    RV

    0.084-0.211

    SV

    0.064-0.206

    TV

    0.127-0.259